If the job is people and materials under a ceiling, shortlist a large-deck crawler, not a roll-forming lift. Screen ARC-F20 at the 20m catalog class, ARC-F25 at 25m, ARC-F31 at 31m, and ARC-F35 at 35m. The class is the height screen. Deck load, entry width, and floor bearing are confirm on RFQ or measure on site. A forming lift such as ARC-T25 or ARC-C25 answers a different question: it holds a roll former. Do not buy it because the brochure also shows a platform.
Contents
- Which catalog class to screen
- The building measurements that beat the class
- Occupied rooms and empty shells
- What to send with the deck sketch
Name the workface before the model
The useful sentence is “we need a deck under this soffit for this crew and these materials.” The weak sentence is “we need the biggest crawler.” Write the first sentence, then use the table to see which catalog class is even in the conversation.
People, tools, and the stack of panels
Say what stands on the deck: crew, hand tools, and whether a bundle of ceiling or wall panels is supposed to ride up with them. This page will not assign a kilogram to that stack. The quotation can, after you describe it. If the stack is unknown, write unknown rather than copying a number from a rental flyer.
Not a roll former
If a roll-forming line must sit on the machine, leave this guide and open ARC-T18, ARC-T25, or ARC-C25. The deck models here are for access and installation. Mixing the two in one RFQ produces a polite answer to the wrong machine.
Door, then height
A 35m class that cannot pass the door is not a 35m solution for that building. Measure the door, the turn inside, and the lowest duct on the route. Do that before you fall in love with the class.
Rescue and the way down
Name how people leave the deck if the machine stops. A catalog class does not contain a rescue plan. Your site does. If you have no plan yet, say so. The quote should not invent one in a footnote.

Reference photograph. It does not prove an entry path.
Catalog height classes for the shortlist
| Model | Catalog height class | What the class is allowed to mean | What you still measure or confirm |
|---|---|---|---|
| ARC-F20 | 20m | A screen for a lower ceiling or a shorter rise | Deck load: confirm on RFQ. Door and floor: measure on site |
| ARC-F25 | 25m | The mid screen most buyers compare first | Deck load and power: confirm on RFQ. Overhead obstacles: measure on site |
| ARC-F31 | 31m | A taller screen, still not a measured underside | Same blanks. Do not subtract 25 from 31 and call it spare reach |
| ARC-F35 | 35m | The tallest class in this family | Entry route often fails before height does. Measure the route |
Soffit, not slab
Measure from the floor you will set up on to the face you must reach. Beams, lights, and sprinklers steal that distance. A class taller than the room can still be useless if the deck cannot pass the beam.
Floor that has to hold the setup
Note slab, soil, or a raised floor. Mark covers and ramps. Bearing pressure is confirm on RFQ. The fact that the floor is a warehouse slab is not a bearing number.
Power and who drives
Say whether the building can feed the machine or whether you will bring power. Say whether the operator stands on the deck, beside it, or both. Unknown is allowed. A guess about voltage copied from another country is not.
Night work and a closed shop
If the ceiling is above a shop that trades in the day, the working hours are part of the machine choice. A deck that can only be driven in at dawn may still be the right class and the wrong week. Write the hours.

Reference photograph. It cannot set an occupant count.
The trade-off is reach against the occupied room
A taller class reaches a higher soffit and usually asks more of the door, the floor, and the exclusion under the deck. A shorter class is easier to bring in and may leave the crew short of the face, which they will then solve with ladders you did not plan. The constraint is the workface, not the largest number in the family.
Occupied building
People who are not your crew still use the floor. The exclusion, the noise, and the hours belong in the RFQ. A photograph of an empty bay is not that building.
Empty shell
You can move further and leave materials on the deck path. You can also discover that the slab was never meant to see a crawler. Measure it anyway.
One bay or the whole grid
If the deck must relocate under a repeating grid, the track path between bays matters as much as the height. Mark three bays, not one hero bay.
The first morning inside the building
Walk the route with the person who controls the door, not with the person who liked the catalog photo. Start outside and write what the crawler meets in order: the street, the gate, the ramp, the door, the first turn, the first beam, and the bay where the deck must sit. At each step write a number you measured or the word unknown. A 25m class that clears the soffit and clips the mezzanine on the way in is a failed entry, and the failure belongs in the RFQ before anyone discusses options.
Note who else is in the building that morning. A shop that keeps a forklift aisle open will not accept the same exclusion as an empty shell. Say whether materials are staged inside overnight or arrive with the crew. Say whether the deck must fold to let that forklift pass, and how many times a day. Those repeats are a site fact. They are not a speed claim.
Write the underside as a list of things the deck must not touch: lights that stay, a sprinkler main, a signage box, a cable tray. You do not need a millimetre from this website. You need the objects named so the quotation can ask which ones move. If nothing can move, say that too. A short class that works around a fixed tray is a better buy than a tall class that only works after someone else redesigns the ceiling.
End the walk with the way the crew gets down if the machine stops away from the door. Name the person who calls that stop and the person who meets them. If those names are the same as the operator, say so. A deck purchase that skips this walk usually comes back as a second quote for a smaller class, after the door has already been promised to the building owner.

Reference photograph. It is not a measured folded size.
Failure modes
This shortlist may not fit when the door is smaller than any folded envelope you are willing to wait for a drawing to prove. It may not fit when the “deck” is actually a basket for one person and a forming line is the real purchase. It may not fit when the floor owner will not allow tracks. It may not fit when you need a published deck load tonight. That number is confirm on RFQ, after the crew and the materials are described.
Deck inputs
- Work height from the setup floor to the soffit, and the catalog class you want screened
- Roof or ceiling geometry, beams, lights, and slope if the face is not flat
- Materials that ride the deck: profile, panel length, or “tools only”
- Wind only if the face is open to weather
- Floor construction under the tracks
- Access route from the street to the first bay, including the door
- Outrigger or track footprint you can mark, or unknown
- Destination and whether the building is occupied
- Chassis is usually not the question; the carrier that delivers the crawler is
- Transport to site, including any container story
- Voltage, power, and where the operator stands
- Documents the building owner will ask to see before entry
- Charging bay and overnight parking, only if a rechargeable option is actually offered
- What the operator must see at each workface, and what the steel hides
Send the bay sketch to the deck shortlist
Send the work height, the site door, the destination, the transport of the crawler, the work zone under the soffit, and the floor note. The signed schedule is project-specific. Editorial images do not set a deck load.
Open ARC-F20, ARC-F25, ARC-F31, or ARC-F35 and use the quote button, or request a quote. WhatsApp +86 15515922444 or leelogly120@gmail.com can carry the same sketch. The OSHA fall-protection overview is for destinations where it applies. It does not choose a class.
Why not ARC-C25?
ARC-C25 is a forming-lift class. Use it when a roll former is the payload. Use ARC-F when the payload is the crew and the materials.
Is 31m the reach under the beam?
No. 31m is the catalog class. The beam is a site measure.
Can the deck take a bundle of panels?
Ask in the RFQ after you describe the bundle. Do not copy a rental sticker.
What if the floor rating is unknown?
Write unknown and who will test it. That is more useful than a guessed tonne.