Roof-forming lifts & work platformsleelogly120@gmail.comWhatsApp: +86 15515922444
roll forming lift RFQ

RFQ Data Guide for High-Altitude Roll-Forming Lifts

roll forming lift RFQ9 min read
Raised red equipment beside building steelwork with coils visible at ground level
Reference photograph showing raised equipment, ground-level coils and building steelwork. It does not define the complete supply scope, confirm capability or represent an ARCLIFT customer quotation.

Editorial & Technical Note

  • Application guidance is educational and does not replace a site-specific lift plan or local regulatory review.
  • Product values are reference configurations; request the signed technical schedule for the quoted machine.
  • Performance comparisons depend on crew, site, weather, access and the selected conventional method.

Send eight lines and a model name. A blank is a better RFQ than a guessed load. Screen ARC-T18 at 18.5m, ARC-T25 or ARC-C25 at 25m, ARC-F25 only if the job is a deck, and ARC-RF8 if the line is in the same buy. Platform load, chassis, and transport stay confirm on RFQ. The point of the file is to make two suppliers answer the same sheet.

Contents

  • The eight lines and the status of each
  • Which purchase you are opening
  • What a useful reply refuses to invent
  • Where to send it

Eight lines, each with a status

Write the line, then write known, measure on site, or confirm on RFQ. Do not fill a status with a number you hope is close.

Work height

The outlet on your section, from the datum you mean. 18.5m and 25m are screens you may cite beside that measurement. They are not a substitute for it.

Panel and coil

Profile name, drawing revision, thickness, coil width, feed side. If the former is ARC-RF8, the sheet class 0.3–1.0mm is only the catalog screen. Your coil may sit inside it or not. Say which.

Machine mass

Known, or unknown. A kilogram taken from a photograph is how a lift gets designed to fiction.

Chassis line

Yes, no, or unsure. One clause: included, local builder, or not decided. Repeat the same words in the email and on the form.

Access in one sentence

Public road, yard, soft ground, or a door. Name the narrowest gate if you know it. If you have not measured the wire, say that. A catalog class cannot discover a gate.

Destination and how many

Country, port, and whether this enquiry is one machine or two. A second machine for a second crew is a different quote from a spare former.

Dates you already hold

Roof dates you already hold are useful. A demand that we invent a manufacture promise is not. Leave that promise off the sheet.

Who answers the follow-up

Name the person and the hour band in their time zone. A file nobody can question is a brochure pointed the wrong way.

Blue machine module suspended beside a red lifting structure in a yard

Reference photograph. It does not identify a model.

Status table you can paste into the form

Line Example of a fair entry Catalog number you may mention Status if unknown
Outlet height Eave on revision C, measured ARC-T18 18.5m or ARC-T25 / ARC-C25 25m as the screen Measure on site
Profile Drawing attached ARC-RF8 sheet class 0.3–1.0mm Confirm on RFQ
Former mass Unknown None Confirm on RFQ
Chassis Local, cab stays Not a height Confirm on RFQ
Pad Slab, covers unmarked None Measure on site
Deck instead of former People under a soffit ARC-F20 20m, ARC-F25 25m, ARC-F31 31m, ARC-F35 35m Confirm load on RFQ
40HQ Box is the limit ARC-T25HQ packing route Packing study, confirm on RFQ
Power Site cable, voltage unknown None Confirm on RFQ

Lift only

You own the former. The RFQ is an interface: mass, mount, coil side, power, and the base.

Lift and line

Put ARC-RF8 and the lift in one message so the mount is reviewed once. Chassis stays on the lift line.

Deck, not a former

If the sentence is about a ceiling crew, stop. A forming-lift RFQ will answer the wrong question.

Two outlets

If two people disagree, send both numbers and label them. Do not average them.

Elevated red equipment beside a building with ground supports and nearby coils

Reference photograph. It cannot replace a section.

The trade-off is a short file against a wrong machine

A thin RFQ gets more questions or a class label with every load left open. A thick RFQ full of invented numbers is worse, because the quotation will treat fiction as a fact. The constraint is honesty about blanks. Unknown is a value we can plan around.

A reply you can compare

Ask every supplier to restate the eight lines in the same order. A reply that jumps to a model code without your outlet and your chassis choice is not ready to set beside another reply.

Blanks that should stay open

Bearing, legal axle, and the week a crate might move. Write them as questions. If a seller closes them with an adjective, ask which document they are quoting.

Ugly attachments are welcome

A phone photo of the eave, a PDF with a revision cloud, and a sketch of the gate are enough to start. Date each file so an older drawing does not win by accident.

A second reader before you send

Hand the file to someone who did not write it. Ask them to point at the outlet, the former, and the chassis choice without asking you a question. If they cannot, the reviewer in another country cannot either. Fix the sentence. A polite paragraph that hides the datum still hides the datum.

Write heights in metres and thicknesses in millimetres, and say so once at the top of the file. If a drawing uses feet, convert it yourself and keep the original beside the conversion. Do not ask the supplier to guess which unit won. Name the drawing revision in the same line as the number. Outlet 22 on revision C is a fact. About 22 is a conversation that will come back as a question. If two drawings disagree, send both and say which one the roof contractor is building to.

A useful reply restates your eight lines, marks each one confirmed or open, and names the document that would close an open line. It does not invent a platform load or a price to make the email feel finished. If a reply offers those without a schedule, treat them as marketing and ask for the line again. You can compare two honest replies. You cannot compare a story with a blank. When you open a catalog model, use the quote link so the model code arrives with the eight lines instead of in a separate thread.

Add the hour band the contact can be reached, in their own time zone. Say whether a translator is needed. Say whether the roof contractor or the importer is allowed to change the outlet after you send the file. Those three sentences stop a week of crossed emails. They are not a commercial term. If the former is already on a previous roof, say what you want repeated and what you want changed, as facts. The RFQ is a selection file. It is not a place to beat another machine with a claim this website will not make. Attach the coil certificate if you have one, and say if you do not. A missing certificate is a blank. A certificate for a different thickness than the drawing is a conflict, and conflicts should be visible in the first email rather than in the third. Name the port only if you already know it. If the port is a guess, write the country and leave the port confirm on RFQ. Two machines for two crews need two chassis lines even when the height class is the same. Say that in the quantity line so the reply does not assume a spare former on a shared truck.

Red crawler equipment on a low-bed carrier with lateral supports visible

Reference photograph. It does not prove a truck scope.

Failure modes

The RFQ may not fit a catalog model when the height is a wish with no section, when the profile cannot be drawn, when the site cannot be entered by the base you named, or when you need a price by tomorrow and will not send the eight lines. It may not fit when the purchase is a deck and the file still says roll former. Change the model list. Do not hope a salesperson will notice.

Copy these into the form

  • Work height and outreach to the outlet you marked, beside the catalog class you want screened
  • Roof geometry, slope, and obstructions
  • Profile, material, thickness, coil width, and feed side
  • Wind exposure and the stop rule
  • Ground or floor under the setup
  • Access route and the narrowest gate
  • Outrigger or track footprint, or unknown
  • Destination country and port
  • Chassis or carrier included, local, or unsure
  • Transport or container assumption, stated as a question
  • Voltage and who owns the controls
  • Documents the destination will ask to see
  • Control cabinet position, and the weather, dust, or wash-down that reaches it

Send the work height, the site, the destination, the transport assumption, the work zone, and the floor or ground note. The signed technical schedule is project-specific. Editorial images do not set a price, a load, or a lead time.

Open the quote link on ARC-T18, ARC-T25, ARC-C25, ARC-F25, or ARC-RF8. The same eight lines fit request a quote, WhatsApp +86 15515922444, and leelogly120@gmail.com. The OSHA fall-protection overview is for your destination reviewer where it applies. It is not a substitute for the eight lines.

Do I have to fill every box?

No. Empty means unknown. Invented numbers are the problem.

Yes. Use the quote button on the catalog page so the code arrives with the lines.

Will a load chart come back the same day?

Not from the website. A chart belongs to a configuration. The RFQ is how that configuration gets defined.

What if I only know the building height?

Send it and mark the datum. One true dimension beats six guesses.

AR

ARCLIFT Technical Editorial

Our editorial team organizes evidence files, project requirements and buyer questions into practical guidance. Technical claims are checked against available evidence and identified as project-specific where needed.

READY TO REVIEW YOUR PROJECT DATA?

Send the working height, panel profile, access and ground conditions, transport limits and destination market. ARCLIFT will identify the configuration questions that need confirmation before a project-specific quotation.

Send Project Data →