An importer’s package is a list of owners, not a container count. Decide who supplies the lift module, who supplies the chassis or carrier, who supplies ARC-RF8 if the line is resold with the lift, and who stands in front of the destination reviewer. Screen height with ARC-T18 at 18.5m or ARC-T25 and ARC-C25 at 25m. Load, documents, and what is in the box are confirm on RFQ. Do not publish a landed price from this page, and do not promise a stock position you do not have.
Contents
- Who owns each line of the package
- What your onward buyer must still send
- Where distributor files fail
- The note to send ARCLIFT
Split origin scope from destination scope
Your customer will ask for “the machine.” You need a table that answers “which machine, which chassis, which papers.” If a line is local, say local. If a line is unknown, say unknown. A blank that looks like a complete package is how a second buyer inherits your gap.
Catalog class is the only number you can repeat safely
You may tell an onward buyer that ARC-T18 is an 18.5m catalog class and that ARC-T25 and ARC-C25 are 25m catalog classes. You may not turn those into a platform load, a road approval, or a crate count. Those close in the quotation package.
One package, one country
A file written for one destination’s registration is not a regional brochure. Name the country on the RFQ. If you sell into two countries, send two packs.

Reference photograph. It does not list a supply package.
Package table
| Line | Origin option | Local option | If you are unsure |
|---|---|---|---|
| Lift module | ARC-T18, ARC-T25, or ARC-C25 as the screen | Not usually local | Confirm the model on RFQ |
| Height you may quote in speech | 18.5m or 25m catalog class | Same class | Do not invent a third height |
| Chassis or carrier | Included from origin | Destination builder | Write unsure; do not leave it implied |
| Roll former | ARC-RF8, sheet class 0.3–1.0mm | Buyer’s existing line | Mass and tooling confirm on RFQ |
| Packing | Module crate, or ARC-T25HQ packing route if 40HQ is the limit | Vehicle that never enters a box | Packing study, not a slogan |
| Commissioning | Origin technician, if the quote says so | Your crew | Name the person |
| Documents for resale | Drawing list in the quotation | Destination filings you own | List the missing sheets |
What your buyer still has to measure
Outlet on their section, gate, and pad. Measure on site. You cannot measure those from a showroom.
Spares and the second call
Say whether a spare kit is in the first shipment or a later one. “Available” is not a kit list. If you do not know the kit, ask for it as its own line.

Reference photograph. It cannot show your resale scope.
The trade-off is a complete origin package against a local chassis
A complete origin package is easier to describe to your first buyer and harder when the destination wants its own vehicle rules. A module plus a local chassis is easier at the port and harder in your contract, because you now own the interface between our drawing and their builder. The constraint is that interface. Write it down before you print a one-page offer.

Reference photograph. It is not a measured supply line.
Failure modes
The package may not fit when the onward offer says “turnkey” and the RFQ still has chassis unsure. It may not fit when two destinations share one document set. It may not fit when you need us to name a platform load so your tender can look finished. Leave the load confirm on RFQ. It may not fit when the former is the buyer’s and nobody has an outline.
Lines to put in the distributor RFQ
- Work height class you want to resell, and the outlet your buyer actually marked
- Roof types you expect: slope, length, seam
- Profile, material, thickness, and whether ARC-RF8 is in the package
- Wind is your buyer’s rule; say if they have one
- Ground they typically set up on
- Access and ports you actually ship through
- Outrigger or track story you are willing to repeat
- Destination country for this file
- Chassis included, local, or unsure
- Transport mode and whether 40HQ is a real limit
- Voltage in that country and who trains the operator
- Documents you must hand to your buyer, and documents you cannot
Send the package table, not a brand page
Send the work height, the site types you resell into, the destination, the transport mode, the handover zone your buyer will face, and the floor or ground they use. The signed schedule is project-specific. Editorial images do not fill a commercial invoice.
Shortlist the screens in the note: ARC-T18, ARC-T25, ARC-C25, ARC-RF8, and ARC-T25HQ only if the box is the constraint. Request a quote, WhatsApp +86 15515922444, or leelogly120@gmail.com. U.S. CBP import and export basics are a destination example, not your paperwork.
Can I tell my buyer the load?
Only after a quotation states it. The catalog class is not a load.
Do you hold machines for distributors?
Ask in the RFQ. This page will not say what is standing in a yard.
Can one drawing set cover three countries?
No. Send one country per file.
Who speaks to my buyer?
Say whether the technical reply goes to you or through you. Name the person.
