Write the lift, the former, and any feed equipment as three power rows. One number does not cover three machines. Screen the height class while the rows are open, and do not add the rows together in your head. How the machines meet is in the electrical interface guide. The line they belong to is in the line specification.
Contents
- Give each machine its own power row
- Compare a package sentence with three rows
- A single load line may not fit
- Power rows to attach
- FAQ
Give each machine its own power row
Name the machine before the number
ARC-T18 is an 18.5m truck screen. ARC-C25 is a 25m crawler screen. ARC-RF8 is a former with a catalog sheet class of 0.3–1.0mm. Put each name on its own row, then ask what power words the seller actually attached to that name. A blank row stays blank. Do not copy the lift row onto the former because the package title was singular.
Keep feed equipment visible
A decoiler, a stacker, or a conveyor is a machine if it is in the purchase. If it is buyer-supplied, say so and ask its provider for its own row. Hiding it inside “the line” is how a supply gets sized for two machines and asked to run three.
Refuse a borrowed total
A total from another profile, another former, or a brochure that is not this offer is not a row. It looks decisive and it is fiction. If you need a total to satisfy a form, the form is ahead of the machines. Send the three rows with unknown where the sheets are silent.
Ask for a sketch that uses your names
The useful reply is a simple diagram that repeats the names you sent: this lift, this former, this feed, and the site source. A generic single-line sketch with no names does not answer the enquiry. Confirm on RFQ if the seller will issue that sketch, and do not draw it yourself to close the file.
Compare a package sentence with three rows
Put the machines on one table
| Machine | Words on its own sheet | If the sheet is silent |
|---|---|---|
| Lift | Copy the power line, or “none” | Unknown; do not borrow |
| Former | Copy the power line, or “none” | Unknown until the former is named |
| Feed or other powered item | Its provider’s line | Say buyer-supplied or not in this purchase |
| Site source | The record, kept separate | See the site-power enquiry |

Reference photograph of a forming module beside a lift frame. It cannot merge two loads.
A package noun is not a sum
“Line power,” “system power,” and “package supply” are commercial nouns. They do not add the rows. Ask the seller to split the noun or to say the split is not in this purchase. Silence is not a sum you may invent.
The sheet class is not a load
0.3–1.0mm says what ARC-RF8’s catalog band covers. It does not say what the former draws, and it does not say what the lift draws. Keep the band on the material row.

Reference photograph of coils beside the building. It cannot total a load.
Height stays a screen
You can ask for 18.5m and 25m to be compared while the power rows are open. You cannot treat the taller screen as the one with the “full” supply. Height and power are different questions. Write both.
The trade-off is one tidy total against three honest rows. The limitation is that a package sentence hides which machine was counted. The constraint is a former or a feed unit that is not chosen yet. The interface is the sketch that repeats your machine names. Without it, stop adding numbers and send the blanks.
An anonymous buyer received one power figure on a cover sheet titled “complete line.” The lift sheet had no power line. The former sheet had a different figure. The feed equipment was not listed. The cover figure matched none of the rows and could not be rebuilt from them. The file that replaced it listed three rows, marked the cover figure as unused, and asked which machines the seller had actually counted. ARC-C25 stayed on the height screen only.
A second anonymous file added a lift figure to a former figure taken from another profile, then asked the site to “confirm the board.” The site record described a different end of the building, and the feed unit was buyer-supplied with no row at all. The sum was not a question the board owner could answer. The corrected note sent the site record unchanged, listed the buyer-supplied feed as a separate provider, and left both equipment figures unknown until each seller wrote on that seller’s own machine.
A third anonymous comparison looked tidy and was not. The cover sheet showed one figure for “the line.” The lift sheet was silent. The former sheet used a different figure from a previous profile. The decoiler was on the layout and on nobody’s power row. A reviewer added the two figures that existed, sent the sum to the board owner, and asked for confirmation. The board owner sent the sum back. It cited machines the owner had not been shown, and it omitted the decoiler the layout showed. The replacement email had four names and no arithmetic: lift unknown, former unknown until that seller writes on this profile, decoiler buyer-supplied and asked of its own provider, site record attached unchanged. ARC-T18 and ARC-C25 stayed height screens beside that list.
Keep the sheet class off the power rows. 0.3–1.0mm can sit on the material line for ARC-RF8 and still say nothing about what any machine requires. If a form you did not design demands a total, answer that the total is not available and attach the rows. Inventing the total to pass the form is the failure the rows exist to prevent. Confirm on RFQ which seller will repeat your machine names on a sketch. A generic sketch with no names is not that reply. Height can be discussed the same day. The sum cannot.
Repeat the machine names in the subject line of the enquiry so a cover total has nowhere to hide. Lift, former, feed, site record: four labels, even when three of them say unknown. If a seller returns one figure, ask which label it sits under, and reject the figure for the file until that answer arrives. Do not store it “for later” in a totals cell. Later is how it becomes the number everyone quotes. The deck or the truck class can still be compared. ARC-T18 and ARC-C25 answer height. They do not answer which label a stray figure belongs to. The former’s sheet class stays on the material row beside them, unused as a load. If a later email arrives with a total and no labels, file it as unused and send the four labels again. Do not promote the total because it is the only number in the thread.
A single load line may not fit
A cover total with no rows
This comparison may not fit when the only power figure sits on a package cover. Split it or discard it. Do not ask the site to confirm a total you cannot explain.
A former copied from another job
It may not fit when the former row was filled from a different profile. Delete the copy. Unknown is safer than a precise fiction.
Feed equipment left off the list
It may not fit when a decoiler or stacker is in the purchase and absent from the power note. Add the row, or write that it is not in this purchase. Do not hope it is small enough to ignore.
Height used as a proxy for power
It may not fit when 25m is chosen over 18.5m because the power question felt unfinished. Change of class is not a change of load. Keep the rows.

Reference photograph of a panel path. It cannot separate machine loads.
Power rows to attach
- Work height at the outlet, and the catalog class to screen
- Roof geometry at that outlet
- Profile, material, thickness, and coil
- Wind limit already used by the panel crew, or unknown
- Floor or ground under each machine
- Access route to each set-down
- Outrigger or track footprint
- Destination country and who reviews the supply there
- Transport split between lift, former, and feed
- Power row for each machine, or unknown
- Documents: each seller’s own sheet, not a borrowed total
Send the work height, the site, the destination, the transport split, the roof zone, and the floor under each machine. The signed schedule is project-specific. Editorial images do not add the loads.
Open ARC-T18, ARC-C25, or ARC-RF8. Request a quote, WhatsApp +86 15515922444, or leelogly120@gmail.com. The HSE guidance on work equipment is a Great Britain note. It does not total these machines.
FAQ
Can I add the lift and the former myself?
No. Send the rows. Let each seller say what that seller included. A homemade total is not a requirement.
What if the former is not chosen?
Leave its row unknown. Still screen the height. Do not borrow another former’s figure.
Does 0.3–1.0mm tell me the load?
No. It is the ARC-RF8 catalog sheet class. Keep it on the material line.
Where does the site board sit in this note?
Beside the rows, not inside them. The site record is not a substitute for a machine row.